Aquifer Injection of Spent Water from Geothermal Heating

Injecting water produced from geothermal heating back into underground aquifers is a cost-effective means of managing excess water. Geothermal energy provides a carbon neutral manner to heat commercial pools and once installed means the operational costs are less sensitive to energy price rises compared to other heating methods. To heat the pool water, hot water from an aquifer is extracted and the heat from the water is then used to heat the pool water via a heat exchanger. A significant amount of cooled water is produced, which needs to be managed and disposed of.

Disposing the water above ground poses several problems including the location and manner of disposal. In some cases, the temperature of the water is too high to dispose into the environment. If the water is deposited into a trade waste system, there is a cost associated with the disposal. Returning the water back to the aquifer provides a means to dispose of the water in an environmentally friendly and cost-effective manner.

A client in Victoria was facing exactly this situation where they were using water to heat water at an aquatics centre. The cooled aquifer water temperature was still up to 67°C, which meant disposal into the environment was not possible. Re-injecting the water back into the aquifer was determined as the best solution.

Project Engineering Solution

Injecting the cooled water into the aquifer posed several challenges. Firstly, the bore location was within a median strip several hundred meters away from the operation. This meant that the footprint of the injection system was severely restricted. Secondly, the static water level was more than 100m below the surface. Thus, simply pouring water into the bore would significantly aerate the water and cause bore clogging.

The proprietary injection valve designed and built by Project Engineering would be perfect in managing the flow of water into the aquifer. This valve would also provide positive pressure in the riser reducing the chance of cavitation. In this instance, due to the temperature of the water and the installation depth, the double acting injection valve designed by Project Engineering was recommended. This valve uses water pressure from the main line to both open and close the valve.

Due to the small footprint of the installation, a completely mechanically operated headworks system designed by Project Engineering was recommended. This system varies the position of the injection valve to provide a constant head pressure irrespective of the flowrate. The system uses no power and can operate completely independent of the main control system. The moment pressure in the main incoming line was sensed, the injection system would start-up, when the pressure was removed the system would shut down.

Injection Outcome

After overcoming a few commissioning hiccups, the installation has been injecting water for more than two years achieving flowrates between 2 L/s and 25 L/s. This has enabled the aquatics centre to reduce its energy bill by $700,000 per annum.

The injection system has been installed in a culvert, which is lockable and completely hidden from the public. Maintenance on the system has been minimal, with only regular checks being required.

The simple operation of the system has meant that operational staff are not required to attend to the headworks and can confidently operate the system without leaving the aquatic centre operational area.

Related Insights

  • Case Study – Aquifer Injection Testing

    3.1 min

  • Case Study – Managed Aquifer Recharge Hypersaline Mine Water

    2.7 min

  • Case Study – Aquifer Storage and Recovery (ASR)

    3.5 min