Harvesting & Injecting Water in a Time of Plenty
During the wet season a significant amount of water runs into storm drains and is discharged into creeks and rivers. There is an opportunity to capture this water, inject the water into underground aquifers and recover this for use during periods of low rainfall. The usage of the aquifer for storage overcomes the problem with the large storage capacity necessary for economic water harvesting. The capacity needs to be significant in size and above ground storage is infeasible due to the cost and area required. Storing this water in aquifers is a viable method, which inherently has significant storage capacity.
A municipal client approached Project Engineering to assist with injecting water into an underground aquifer, which would be collected from a nearby storm drain during the wet season. The injection system would be fed from a filtration process to manage water quality into the aquifer. The unit would need to manage the injection flowrate, whilst operating without autonomously, as this installation is isolated from any operational staff buildings.
An abstraction bore some distance away from the injection site would be used during the dry season to remove the injected water for the watering of sports fields, thereby using the aquifer for storage and later recovery (ASR).

Project Engineering Solution
The injection valve designed and manufactured by Project Engineering was the perfect solution to manage the injection flowrate and minimise any air entrainment during injection by keeping a positive pressure in the riser. The injection valve only has one moving part, which ensures low maintenance and utilises the same water for injection to operate the valve hydraulically, thereby eliminating the opportunity to compromise the aquifer by introducing other fluids.
The valve would be installed using several rigid FRP risers. The simple installation method that these allowed for, meant that specialised equipment would not be required, therefore, installation could be done using a Hiab available to the council.
A specifically designed headworks system to the specifications of the project was developed and fabricated by Project Engineering. The final design included enclosures for sensitive equipment such as flowmeters and pressure gauges to keep it protected from the environment and any potential vandals. This was required as the installation would be within a community park operated and maintained by the council.
The headworks incorporated all the necessary air relief valves, flow meters, isolation valves, and solenoid control valves to ensure successful injection of the water. All of this equipment has been rigorously utilised in the harsh environment of the Pilbara successfully and reliably, thus providing a solution that put the clients mind at ease.
The control system provided with the headworks was fully automated, with safety shutdown functions which would take over in the case of any undesired operation. Interaction with the control system was done using an HMI on the control panel. The required injection flowrate could be set on this by the client and the system would vary the injection valve position to achieve the desired injection flowrate. The HMI also showed pertinent system variables such as injection flowrate, injection pressure and bore water level. Local control was also possible, allowing the unit to be started and stopped directly from the HMI.
Outcome
Over a five-year period, the system provided by Project Engineering has injected 225 ML of storm water into the underground aquifer, at consistent flowrates of 12 L/s when the water was harvested. The system has required minimal maintenance, with the valve being removed during the dry season to ensure there was no fouling and the system put into standby mode.
The control system has proven to be robust with minimal safety shutdowns and proving to be able to absorb any upstream disturbances. Control of the injection flowrate was achieved quickly after coming online and was stable during operation.
The injection system proved that water could successfully be harvested, injected into underground aquifers and recovered for use at a later stage. The injection component has ensured that the process resulted in minimal negative effects on the receiving aquifer. This project has been so successfully the potential to expand the scheme is being investigated.