Project Overview

The specifically designed reinjection system for BHP surplus water projects, injects up to 90L/s with a separate control unit. The control unit has been designed such that it can operate for more than 5 days without solar charging.

The units are fully constructed and tested prior to leaving for site. This allows for minimal site work and ensures all aspects of the system are functional before dispatch.

All piping and support skids are galvanised steel to allow for long life in harsh remote settings

Project Engineering BHP MAR Unit
Project Engineering Jimblebar HW
Project Engineering Control Skid